The Welcome Mat

Welcome to this Blog. Hopefully you may find it of use (i doubt it but it doesnt stop me hoping does it?). All my skills are normally self taught, and at the moment i'm a lone ranger when it comes to my layout with the occasional help from friends (normally it involves alot heckling).

I've never yet got a layout really past the electrics stage. I normally lose interest which is why i've decided to become involved in lots of things so i can vary my time between different things. All the work you see on Westleigh is my own work and all the photos you see on my fotopic sites are again my own work. I'm amazed i havent started to play with it, perhaps leaving the vast majoirty of the wiring to the end helps.

My main interest in railways is principally the early 90s. Even though i only just got into double figures in terms of age just as privitisation came in, i find it a very interesting period. My earliest memories were at Salisbury, Oxford and Bristol. So to counteract this aswell i tend to model the northwest scene during 1990 to 1994. However i also do the Wessex area during the same period and the scottish lowlands during 1988-1990.

I do have a little interest in the 1996-1998 privitisation period. I'm more aware of this period than the sectorisation period and again i wouldnt mind if it turned into this era.

I also am working on a project of Devizes station in 1963/64 just before alot of the line was rationalised and eventually closed. This however is a very very long term project and probably wont get anyway for many many years yet.

I do spend alot of time in the summer out an about doing photography particularly of civil jet aircraft. I'm certainly no David Bailey but i'm reasonably proud of most of the photos taken.

Anyway i suppose i really should get off the computer and get on with some modelling work, except work has a tendancy to get in the way!

Wednesday 17 February 2010

Reducing Requirement (WR) + (GR)

I know another day missed, my excuse is I'm full of a cold and i really couldn't be bothered so here it is, yesterdays and todays rolled into one.

Firstly to update the progress on Westlea, Ive now more or less finished the shed area and joy of joys, i now have the station building in the form of some Peco Office buildings (LK81), I've just got to decide which way i am going to build them, that being the difficult bit.

I'm also working on the N gauge plan. It does have a name already (the most important bit that) so i hereby name it "Gatslow Road". Its going to be 11x3 split into three boards and will be a double track continuous run with a depot in the middle. Yes i know its been done loads of times before but it suits my needs best. Track is as yet undecided but it will use electrofrog points, and that's more or less all i can tell you at the moment as i don't know the rest myself yet.

No comments:

Post a Comment