The Welcome Mat

Welcome to this Blog. Hopefully you may find it of use (i doubt it but it doesnt stop me hoping does it?). All my skills are normally self taught, and at the moment i'm a lone ranger when it comes to my layout with the occasional help from friends (normally it involves alot heckling).

I've never yet got a layout really past the electrics stage. I normally lose interest which is why i've decided to become involved in lots of things so i can vary my time between different things. All the work you see on Westleigh is my own work and all the photos you see on my fotopic sites are again my own work. I'm amazed i havent started to play with it, perhaps leaving the vast majoirty of the wiring to the end helps.

My main interest in railways is principally the early 90s. Even though i only just got into double figures in terms of age just as privitisation came in, i find it a very interesting period. My earliest memories were at Salisbury, Oxford and Bristol. So to counteract this aswell i tend to model the northwest scene during 1990 to 1994. However i also do the Wessex area during the same period and the scottish lowlands during 1988-1990.

I do have a little interest in the 1996-1998 privitisation period. I'm more aware of this period than the sectorisation period and again i wouldnt mind if it turned into this era.

I also am working on a project of Devizes station in 1963/64 just before alot of the line was rationalised and eventually closed. This however is a very very long term project and probably wont get anyway for many many years yet.

I do spend alot of time in the summer out an about doing photography particularly of civil jet aircraft. I'm certainly no David Bailey but i'm reasonably proud of most of the photos taken.

Anyway i suppose i really should get off the computer and get on with some modelling work, except work has a tendancy to get in the way!

Monday 2 January 2012

new year, New direction?

Well i said i would do a big update and here it is. The last few weeks have been busy as would be expected at this time of year. It doesnt mean however no modelling has been done. In fact quite the opposite actually as plenty has been done, however it does seem that for every job that has been completed another presents itself.

Firstly ive been busy on the presentation of the layout. The fascia has been rubbed down and resprayed. I prefer to spray rather than brush paint as A) its quicker and B) i think you can get a smoother finish and C) its alot easier!
Ive also made a new piece for the section in front of the scenic break. This now has got a single piece rather than the ugly fill in piece.
This teamed with some new signage which has been laminated looks far more professional. The curtain has also been given a wash.

The 3rd rail instalation has also been gaining pace. The chairs have been painted an are now attatched to rails. I'm planning to get the rails in place this week. Then i need to add some wiring using black multicore wire. I then need to add all of the associated boxes and signage.

The one job i havent started for lack of funds to do it is the fiddle yard. At the moment it isnt that important as the layout isnt being operated but i need to think about it seriously soon as it needs to be done. I'm just making sure i havent left any alternatives before i begin.

Ive also been adding some greenery of various shades to the areas that need to try and bring out some life and disorganisation. This in some respects is something that can be tweeked for years.

Apart from that its going to be a quiet start to 2012 for Westleigh. I hope however the start 2013 will be anything but.

Happy new year.