Well things have changed somewhat since the orriginal plan. I've redesigned the fiddle yard to provide me with a mainline and a siding yard. The mainline yard deals with through trains and the siding yard (the 3 roads) provides for the sidings. I'm planning to use setrack points on these simply because of cheapness and when i budgeted it all out orriginally it came to £260! By using S/H setrack points i can reduce it by nearly £90!
Its next show will actually be in Chippenham again in September this year. Well the exhibition manager was obviously desperate but it will be a useful shakedown.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment