Im quite pleased with the plan as i have finally got a layout that can take a loco and 5 coaches or a loco and 12 SLUs such as PCAs or HEAs, so i can finally operate it prototypically which must be a first for me.
I hope to get the track tomorrow so i can get on with it. I tend to work fairly fast as i tend to enjoy myself doing it. So therefore expect to see me wiring it up next week. I want to do the scenics better on this one however, although the previous layout was acceptable i thought i could do much much better so i will take longer and investigate different methods first before deciding what i want to do in the hope it improves.
Anyway enough for today.
No comments:
Post a Comment