The Welcome Mat

Welcome to this Blog. Hopefully you may find it of use (i doubt it but it doesnt stop me hoping does it?). All my skills are normally self taught, and at the moment i'm a lone ranger when it comes to my layout with the occasional help from friends (normally it involves alot heckling).

I've never yet got a layout really past the electrics stage. I normally lose interest which is why i've decided to become involved in lots of things so i can vary my time between different things. All the work you see on Westleigh is my own work and all the photos you see on my fotopic sites are again my own work. I'm amazed i havent started to play with it, perhaps leaving the vast majoirty of the wiring to the end helps.

My main interest in railways is principally the early 90s. Even though i only just got into double figures in terms of age just as privitisation came in, i find it a very interesting period. My earliest memories were at Salisbury, Oxford and Bristol. So to counteract this aswell i tend to model the northwest scene during 1990 to 1994. However i also do the Wessex area during the same period and the scottish lowlands during 1988-1990.

I do have a little interest in the 1996-1998 privitisation period. I'm more aware of this period than the sectorisation period and again i wouldnt mind if it turned into this era.

I also am working on a project of Devizes station in 1963/64 just before alot of the line was rationalised and eventually closed. This however is a very very long term project and probably wont get anyway for many many years yet.

I do spend alot of time in the summer out an about doing photography particularly of civil jet aircraft. I'm certainly no David Bailey but i'm reasonably proud of most of the photos taken.

Anyway i suppose i really should get off the computer and get on with some modelling work, except work has a tendancy to get in the way!

Thursday 5 April 2012

Replatformed

Well not replatformed as such but restationed certainly. Ive decided to do away with the bridge and go back to something similar to Westleigh mk1 and have a footbridge and bus station. Once i have the continious run up together though i will be looking at putting the bridge in and hopefully by that time i should have a station building of some for or another.

Apart from that board 1 is virtually complete and work has commenced doing the back area of board 2. Im going to use the knightwing fencing and am currently awaiting its delivery. Hopfully it should be here Saturday so i could start it then. This mean i should be able to complete the majority of the layout over the weekend. It will then also mean i will need to consider the fiddle yards. But theres still stuff to do before then!

No comments:

Post a Comment