Well the wiring is almost finished with the completetion 3 of the 5 signals along with all the light feeds having been soldered up. I only have 10 solder joints to make. These include 8 for the two On-On-On switches and a pair for a flashing light which i cant wire up to a tag strip yet as i dont know where it goes! The wiring should be completed next month as i wont be getting the switches till trainwest. So in the meantime..
Im currently looking at station buildings. These will be on the bridge over th station. Thats about as much as i know so far as im not quite sure what building looks right there and even then no kit or even slightly kitbashed building may not look right so a period of research is called for.
Apart from that there isnt much else to report, the platform is more or less finished, just needs painting and then having a black wash applied to bring out the cracks. For what was my first scratchbuild im really quite pleased, it will look even better once finished!