Friday, 20 December 2013
Its back....
Sunday, 28 July 2013
The 3rd Rail
Saturday, 29 June 2013
Summertime Modelling
Monday, 24 June 2013
Wetbury Begins
Saturday, 22 June 2013
Its been a while!
Tuesday, 10 July 2012
A new update
Monday, 9 July 2012
Dont go away...
Monday, 4 June 2012
A new update for a new month....
Sunday, 20 May 2012
Weird Posts
Tuesday, 15 May 2012
Fiddling away
The only other thing to report is a change in location. Its now in the wessex area. My eventual plan is to fit 3rd rail to the main lines and the loop. This will mean i can add a Hornby 4Vep to my fleet. Assuming i can find one that works of course. A 4cig wouldnt go amiss either.
Nothing else however is changing as nothing needs to be changed. The only job i have to do is to add two shunt signals as the fixed signals will be off scene. Then its just a question of ballasting, flocking etc to make it look all presentable.
And im still waiting for my dynamis command station back from Bachmann Its been 7 weeks now!!
Thursday, 10 May 2012
Fiddling it all
Ive also been working on the other scenic break. Its difficult to describe but there is a station building along with a bus depot and a row of shops. I have a sketch of it which i will upload tomorrow. But for now youll have just imagine it all :D
Sunday, 6 May 2012
Autoglym
Trackage
Ive also had the chance to do some rolling stock work this weekend and have dismantled 7 lima TEA tanks for respray, denumbered and denamed a 37 and began removing the logo off the mobil TTA tanks. Ive begun using a car polish to remove the numbers and logos and found it worked quite well. Ill post a pic in the next post of the said polish but i know halfords stock. Tcut also works but is far more abrasive so this stuff is better as its less abrasive but still effective.
Anyway enough for now....
Thursday, 26 April 2012
Timber!
The next task is to lay the track and add the wiring. I will begin from the current scenic break and work round so that i can have it in a working U shape initially. Then i will complete the last two boards to give me a continious circuit.
This means i need to consider the station again and how im going to do it as i currently dont have a clue so no change there then.
Thursday, 19 April 2012
Flasher and Furniture
I would say im roughly half way through. There lots more to do and the clock is ticking. Better stop yakking and get cracking.
Tuesday, 17 April 2012
Fiddling Around
One job i have to do is to build some legs for the fiddle yard. I have two legs i can widen by replacing the cross members but i need at least two more which will have to be constructed from scratch although i hope this shouldnt be too difficult.
In terms of the scenic section i have added the concrete barriers to the bus station today and stuck down some of the industrial estate details. Hopefully in the next day or two i will pack it down and do the end plates (see above) and then begin work on the fiddle yard.
Before i do this however i have also drilled the hole for the digger. This needs wiring in so i need to solder up some wires (should only take 10 minutes or so) so i can get this working. I will do this before i dismantle it so i know its done.
Anyway enough for now!
Monday, 16 April 2012
Saturday, 14 April 2012
Update
Also the last 47 needed has arrived in the form of 47975 in dutch for the princley sum of £59.99. I only need two more locos but i still have lots of dmu gaps.
Im also still considering the fiddle yard and what im going to do there but its late and another day beckons!!