Tuesday, 10 July 2012
A new update
Monday, 9 July 2012
Dont go away...
Monday, 4 June 2012
A new update for a new month....
Sunday, 20 May 2012
Weird Posts
Tuesday, 15 May 2012
Fiddling away
The only other thing to report is a change in location. Its now in the wessex area. My eventual plan is to fit 3rd rail to the main lines and the loop. This will mean i can add a Hornby 4Vep to my fleet. Assuming i can find one that works of course. A 4cig wouldnt go amiss either.
Nothing else however is changing as nothing needs to be changed. The only job i have to do is to add two shunt signals as the fixed signals will be off scene. Then its just a question of ballasting, flocking etc to make it look all presentable.
And im still waiting for my dynamis command station back from Bachmann Its been 7 weeks now!!
Thursday, 10 May 2012
Fiddling it all
Ive also been working on the other scenic break. Its difficult to describe but there is a station building along with a bus depot and a row of shops. I have a sketch of it which i will upload tomorrow. But for now youll have just imagine it all :D
Sunday, 6 May 2012
Autoglym
Trackage
Ive also had the chance to do some rolling stock work this weekend and have dismantled 7 lima TEA tanks for respray, denumbered and denamed a 37 and began removing the logo off the mobil TTA tanks. Ive begun using a car polish to remove the numbers and logos and found it worked quite well. Ill post a pic in the next post of the said polish but i know halfords stock. Tcut also works but is far more abrasive so this stuff is better as its less abrasive but still effective.
Anyway enough for now....
Thursday, 26 April 2012
Timber!
The next task is to lay the track and add the wiring. I will begin from the current scenic break and work round so that i can have it in a working U shape initially. Then i will complete the last two boards to give me a continious circuit.
This means i need to consider the station again and how im going to do it as i currently dont have a clue so no change there then.
Thursday, 19 April 2012
Flasher and Furniture
I would say im roughly half way through. There lots more to do and the clock is ticking. Better stop yakking and get cracking.
Tuesday, 17 April 2012
Fiddling Around
One job i have to do is to build some legs for the fiddle yard. I have two legs i can widen by replacing the cross members but i need at least two more which will have to be constructed from scratch although i hope this shouldnt be too difficult.
In terms of the scenic section i have added the concrete barriers to the bus station today and stuck down some of the industrial estate details. Hopefully in the next day or two i will pack it down and do the end plates (see above) and then begin work on the fiddle yard.
Before i do this however i have also drilled the hole for the digger. This needs wiring in so i need to solder up some wires (should only take 10 minutes or so) so i can get this working. I will do this before i dismantle it so i know its done.
Anyway enough for now!
Monday, 16 April 2012
Saturday, 14 April 2012
Update
Also the last 47 needed has arrived in the form of 47975 in dutch for the princley sum of £59.99. I only need two more locos but i still have lots of dmu gaps.
Im also still considering the fiddle yard and what im going to do there but its late and another day beckons!!
Friday, 13 April 2012
Trainwest
Sunday, 8 April 2012
Fenced
The paving in the bus station is now complete along with the platform slope. I still have the concrete barriers to add in the bus station.
Once the two sets of jobs above have been completed in terms of the main layout i can begin adding the details. Ive got two ice cream tubs of bits that came of Westleigh mk1 some of which will go on to mk2. I need to sort through and choose what i will use and what i wont.
I also need to get back to construction issues such as the fiddle yard. So far only the boards have been built so theres plenty to do but thankfully plenty of time to do it all in. Its still only 23 weeks though!
Friday, 6 April 2012
Bus stopping....
I also hope the fencing should arrive tomorrow. This will allow me to get on with this and finally finish it.
The to do list gets shorter and then gets longer when items related to things recently completed appear so it seems to be in a state of equilibrium.
Thursday, 5 April 2012
Replatformed
Apart from that board 1 is virtually complete and work has commenced doing the back area of board 2. Im going to use the knightwing fencing and am currently awaiting its delivery. Hopfully it should be here Saturday so i could start it then. This mean i should be able to complete the majority of the layout over the weekend. It will then also mean i will need to consider the fiddle yards. But theres still stuff to do before then!
Saturday, 31 March 2012
The illuminated shed
Apart from that the only other work today has been the fitting of the backscenes. This is so i can see what buildings im likely to use and see how they fit. Im definitley going to use the pikestuff buildings but the peco trainshed bits are touch and go so we shall have to see.
I hope tomorrow to get on and do some of the gap filling with flock and ballast so it will look more like a layout. I think then it will really come to life. But thats all for another day....
Friday, 30 March 2012
Concreted
One further job for today concerens the station end. Ive attatched the mount so i can screw the walls to the boards. I can then also think about whats going to happen up here too.
But thats all for another day.....
Thursday, 29 March 2012
The next step
One big change is by the exsisting scenic break, the more and i looked at it the more i thought it didnt look right. So i took it all up along with shortening one track and extending the other. This means i can put the shed further back and means adding the plasticard shed base will be easier.
Ive still not decided on a station building but dapols CO14 looks to be a good bet especially if two were merged and bashed together. I just need to get two kits and try. The other thing i need is the steps from building to platform. These are likely to be scratchbuillt from either a dapol or wills footbridge kit bashed so its just the steps dualed up.
The dynamis has also gone off for repair with the estimate being 4 weeks. Oh well plenty to do in the mean time like build a fiddle yard!
Saturday, 24 March 2012
Palace calling
Anyway enough for today as i was up at 5am and im already on bst which shows the current time as 11.14pm so at least you cant say im not prepared.
Friday, 23 March 2012
David Bayleys about!
Thursday, 22 March 2012
Ballasted
The ballast is woodland scenics grey blend which i think gives a good colour especially when weathered down. So far i have done most of the straight sections of track leaving just the points to do which i will need to do very carefully to avoid problems from before!
As i mentioned above i have relaid the hardstanding at the shed end. It just looked odd and as id glued bits to it i reasoned just take it out and start again and cut it out complete of an A2 sheet of card which i did. I used the old as a template for part of it with the new section added on. This now means there is road access up past the shed which looks far more realistic. It just needs spraying with my grey primer mix and then sticking down, another job then completed!
Sunday, 18 March 2012
Wires of many colours....
Im currently looking at station buildings. These will be on the bridge over th station. Thats about as much as i know so far as im not quite sure what building looks right there and even then no kit or even slightly kitbashed building may not look right so a period of research is called for.
Apart from that there isnt much else to report, the platform is more or less finished, just needs painting and then having a black wash applied to bring out the cracks. For what was my first scratchbuild im really quite pleased, it will look even better once finished!
Wednesday, 14 March 2012
Structural engineering
I really do however need to consider the station end. My original plan was and still is to have the station up on high. I have visions about what it looks like. Im just not sure how to achieve it but im sure ill think of something. I suppose the first thing is to build a wooden support for it all so i can clad it in brick sheet and then go from there.
Also my dynamis unit has gone on the blink. The handset and the base station arent talking. Trouble is ive tried every suggestion all to no avail. I only have one option left and thats the change the batteries for a good quality set as that can sometimes make a difference. Its worth a shot otherwise its an expensive trip to bachmann!
Tuesday, 13 March 2012
Platforming
Anyway on to the layout, today i began platform work. All 25 peco platform sides are joined up ready for me to cut the wills victoria paving sheets tomorrow. I need to reduce the size of the sheets as they are currently to wide. I plan to build the platforms off the layout and then fit them. Doing it this way makes them much easier to construct. I can also strengthen them far better than i would otherwise be able to do. They should hopefully look much better than my previous attempt at a platform. I just need to decide now what colour to paint them, then once done i can give them a dirty wash of black to give the slab lines a bit more visability.
Anyway enough gibbering from me for now. Onwards to tomorrow.
Monday, 12 March 2012
Signalling the way.
Why am i posting this at 2.30 am? Well im also stuffed full of a cold so as im awake now seemed an opportune time.
Saturday, 10 March 2012
All electric
The wiring is more or less done, all the points havin been wired up although i am going to install a catch point for the loop which has proved very difficult to get hold of it although im told one should be waiting for me at the worcester show where i am now.
Ive also got all the signals now i just need to install them and wire them up. Thats one of this week jobs aong with the catch point and starting the scenic work. Ive only got 8 months left! Better get on with it!
Sunday, 4 March 2012
Pointed....
The first job will be to paint the tracks and put the platform edging in. I plan to use the wills victoria paving sheets for the tops. I will also get some more wills cable trunking and add that. Then its on to ballasting. It will be woodland scenics grey blend as before but this time done properley rather than rushed which is what i normally do. Will i be able to hold myself to that? Only time will tell!
Anyway enough for today onwards to tomorrow!
Saturday, 3 March 2012
Copper cladding
anyway enough for now but hopefully a very productive day tomorow!
Tracked and sorted
Friday, 24 February 2012
Further dismantling
Im quite pleased with the plan as i have finally got a layout that can take a loco and 5 coaches or a loco and 12 SLUs such as PCAs or HEAs, so i can finally operate it prototypically which must be a first for me.
I hope to get the track tomorrow so i can get on with it. I tend to work fairly fast as i tend to enjoy myself doing it. So therefore expect to see me wiring it up next week. I want to do the scenics better on this one however, although the previous layout was acceptable i thought i could do much much better so i will take longer and investigate different methods first before deciding what i want to do in the hope it improves.
Anyway enough for today.
Thursday, 23 February 2012
TIMBER
Tonight i mainly played around with track plans using the peco templates and now have a virtually workable plan. Hopfully i can get some track in the comming days and begin laying!!
On a seperate note our new board band package was activated today and its just so much faster (averaging 16mb) so i hope to upload more photos than i did before.
Wednesday, 22 February 2012
A change...
All this mean is i can no start again with a new plan and eased curves. Im stil clarifying the new plan at present but hope to have something soon. Needless to say the new boards will be well braced!
Wednesday, 8 February 2012
A new expanding plan!
Its next show will actually be in Chippenham again in September this year. Well the exhibition manager was obviously desperate but it will be a useful shakedown.
Saturday, 4 February 2012
Monday, 2 January 2012
new year, New direction?
Firstly ive been busy on the presentation of the layout. The fascia has been rubbed down and resprayed. I prefer to spray rather than brush paint as A) its quicker and B) i think you can get a smoother finish and C) its alot easier!
Ive also made a new piece for the section in front of the scenic break. This now has got a single piece rather than the ugly fill in piece.
This teamed with some new signage which has been laminated looks far more professional. The curtain has also been given a wash.
The 3rd rail instalation has also been gaining pace. The chairs have been painted an are now attatched to rails. I'm planning to get the rails in place this week. Then i need to add some wiring using black multicore wire. I then need to add all of the associated boxes and signage.
The one job i havent started for lack of funds to do it is the fiddle yard. At the moment it isnt that important as the layout isnt being operated but i need to think about it seriously soon as it needs to be done. I'm just making sure i havent left any alternatives before i begin.
Ive also been adding some greenery of various shades to the areas that need to try and bring out some life and disorganisation. This in some respects is something that can be tweeked for years.
Apart from that its going to be a quiet start to 2012 for Westleigh. I hope however the start 2013 will be anything but.
Happy new year.